Share a little good energy.
Give every trade the same kitchen plan
A kitchen remodel brings cabinet dimensions, appliance connections, plumbing and lighting into a small space. Start with one dated layout that the homeowner, designer, contractor and electrician can all reference. A changed refrigerator location can affect more than the cabinet order.
Include cabinet elevations, countertop dimensions, island seating, appliance positions and finished floor heights. Mark decisions that are still open. Before rough-in, walk through the plan together and identify who approves revisions; a verbal change should reach everyone whose work it affects.
Choose models before assigning circuits
An appliance name is not an electrical specification. Collect the model number and installation instructions for each built-in appliance, including items you intend to keep. Manufacturers specify electrical ratings, connection methods and installation conditions for the particular product.
Have the electrician determine which appliances need individual circuits and how the countertop circuits will be arranged. Do not turn a generic checklist into one dedicated breaker for every appliance. Existing wiring also needs assessment before it is reused for a replacement in the same opening.
- List the range or cooktop, wall oven, refrigerator, dishwasher, disposal and microwave.
- Add the hood, beverage refrigerator, warming drawer, instant-hot unit and any built-in coffee equipment.
- Show where small appliances actually operate, especially the coffee station, toaster and air fryer.
Check capacity before committing to electric cooking
Changing from gas cooking to a full-size induction range or cooktop calls for an electrical review before delivery. The connection used for gas ignition does not establish that the circuit can serve the new appliance. The selected model, existing wiring and routing determine the work required.
Ask for a load assessment that considers the house as well as the kitchen. Empty breaker spaces and a panel's label are not a load calculation. A remodel does not automatically require a service upgrade; the assessment should explain whether existing capacity is usable, additional circuits are needed or service work must be coordinated with the utility.
Resolve countertop and island outlets before stone
Tell the electrician where you prepare food, use countertop appliances and sit at the island. Then have the proposed locations checked against the code that applies to the permit, the cabinet construction and the selected products. Receptacle placement also needs to account for sinks, cooking surfaces and breaks in the counter.
Island and peninsula provisions have changed between code editions. As of September 2026, Washington L&I identifies the 2023 NEC as its adopted edition, and Seattle publishes local amendments. Have your electrician confirm the applicable island requirements, any provision for future power and the permitted mounting options with the local authority before approving cabinetry. Do not assume a side-mounted receptacle from an inspiration photo is acceptable for your project.
Plan protection and service access together
Include GFCI and AFCI protection in the circuit review. GFCIs address ground-fault shock hazards; AFCIs address hazardous arcing. Their purposes differ, and the electrician should determine the required protection for each new or altered circuit under the applicable rules.
Ask where you will operate or test protective devices and how appliances can be disconnected for service. Coordinate the connection locations with drawers, pullouts, plumbing and manufacturer instructions. A clean-looking backsplash should not come at the expense of an inaccessible connection or an outlet that interferes with the appliance.
Lay out lighting where the work happens
Plan general room lighting, counter lighting and pendants as separate decisions. Stand at the sink and preparation counter on the drawings: where could your body cast a shadow, and which lights would you want during cleanup or a quiet evening? Locate pendants from the final island dimensions, including seating and overhangs.
For under-cabinet lighting, select the fixture or tape system, driver location and controls before the cabinets arrive. Have the installer confirm dimmer and driver compatibility using the manufacturers' information. Review a light sample against the cabinet and counter finishes rather than assuming every warm-white product will look identical.
Compare estimates using the complete scope
The outlet count tells only part of the price story. Wiring routes, access above or below the room, existing conditions and the distance to the panel can change the work. Ask how hidden problems will be documented and approved if demolition reveals them.
- Identify included circuits, fixtures, controls and owner-supplied products by model where possible.
- Clarify who handles openings, drywall repair, painting and cabinet or stone modifications.
- Ask whether panel work, permits, inspections and return visits for appliance connections are included.
- Decide how power outages and temporary cooking arrangements will fit the household's schedule.

Leave room in the schedule for inspections
Agree on the sequence before demolition: selected appliances and approved drawings, electrical assessment, permits, rough-in and required inspection, then closing surfaces and installing finishes. Washington L&I says electrical inspection must be requested before work is covered, and the contractor obtains the permit for the electrical work they perform.
Coordinate final connections and inspection with appliance delivery. At handoff, review circuit labels, lighting controls, protective-device testing and outstanding items. Keep the final layout and equipment manuals together. That record will be useful when an appliance is serviced or the next homeowner wants to understand the kitchen.
Helpful sources
Official guidance for a closer look.
- GE Appliances: model-specific induction cooktop information
- Seattle City Light: capacity, load and electrical service
- Washington L&I: electrical laws, rules and code adoption
- Seattle SDCI: electrical code and local amendments
- Leviton: GFCI, AFCI and household electrical safety
- Lutron: LED compatibility tool
- Washington L&I: electrical permit basics
A good idea is better shared.

